Citywide Trail Gap Improvements (Park Bond Referendum)
The City of Lakeville’s Park Bond Referendum included construction of 3.75 miles of pedestrian trails to improve safety, connectivity and close existing gaps citywide. The trails that are proposed to be constructed in 2023 are located in the following areas:
- West side of Kenyon Avenue from Kingsway Path to 178th Street
- Chadwick Conservation Area Trail from Jacquard Avenue to Dodd Boulevard
- South side of 175th Street from Junelle Path to Jasmine Avenue
- West side of Highview Avenue from 172nd Street to 168th Street
- East side of Holyoke Avenue/Highview Avenue from Heritage Drive to 185th Street
- East side of Cedar Avenue from 210th Street to Gemini Trail
Project Timeline
- Discovery: February – May 2022: Data collection (surveying, soil borings) and preliminary design
- June 2022: Meet with impacted property owners to gather feedback
- Design: July – December 2022: Final design of the selected improvements
- 2023: Construction
Neighborhood Meeting No. 1
Holyoke Avenue and Highview Avenue (Heritage Drive to 185th Street) and Chadwick Conservation Area
City staff held neighborhood meetings on August 17, 2022 for the proposed trails along Holyoke Avenue/Highview Avenue (from Heritage Drive to 185th Street) and within the Chadwick Conservation Area. Project staff presented the preliminary design concepts for the trails, information regarding project schedule and answered questions relating to property impacts.
Neighborhood Meeting Summary
Neighborhood Meeting Graphics
- Overall Project Map – City Wide Trails included in the Park Bond Referendum (PDF)
- Overall Holyoke Avenue and Highview Avenue Trails Map (PDF)
- Holyoke Avenue and Highview Avenue Preliminary Design (PDF) - Overall Chadwick Conservation Area Trail Map (PDF)
- Chadwick Conservation Area Trails Preliminary Design (PDF)
If you have any questions regarding the information presented at the neighborhood meetings, contact Alex Jordan, Assistant City Engineer, at 952-985-4503 or ajordan@lakevillemn.gov.
-
Paul Oehme
Public Works DirectorPhone: 952-985-2700
-